Made this film for a school project. We built the bathroom on a $100 budget. Shot for 3 days in 104 degree weather inside a non air conditioned garage. Found actors the day of the shoot ( very bad planning obviously)
I had no hope for the film due to lack of support from my parents. I was 17 at the time.
anyway. I think it turned out okay for something that was rushed.
http://vimeo.com/5495980
I had no hope for the film due to lack of support from my parents. I was 17 at the time.
anyway. I think it turned out okay for something that was rushed.
http://vimeo.com/5495980
Upvote
0